Design-Build Bridge Replacement Hollis E. Jennings
![Berkely 6.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/ece39d04c53a41b2992a269aefebac3f/1/GCuCv726gZycFxatRFZ6HA/Berkely%206.jpg)
![Berk 8.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/abf43063b8fd4d90a1ac424f6887aeee/1/GCuCv726gZycFxatRFZ6HA/Berk%208.jpg)
![Berk 7.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/c7c8762c9f9d469f9d4d343437e1b779/1/GCuCv726gZycFxatRFZ6HA/Berk%207.jpg)
![Berkley 1.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/e35adb63953f48ecb1d7bb1fecdd230a/1/GCuCv726gZycFxatRFZ6HA/Berkley%201.jpg)
![Berkley 2.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/cbbbbc679ddd407baecc813bf6cf3779/1/GCuCv726gZycFxatRFZ6HA/Berkley%202.jpg)
![Berkley 3.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/b8558981cc254c1790cd9fbcb6c6a723/1/GCuCv726gZycFxatRFZ6HA/Berkley%203.jpg)
![Berkely 4.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/a553ef55f9fc4e449454cb80daf55b48/1/GCuCv726gZycFxatRFZ6HA/Berkely%204.jpg)
![Berkely 5.jpg](https://static.mywebsites360.com/b1b22f01b8df421d9474d54e0dfc9961/i/a0dbac240cf04cca8b7637245dfaec63/1/GCuCv726gZycFxatRFZ6HA/Berkely%205.jpg)
PROJECT DETAILS:
This design-build project required the construction of a new bridge over 4 lanes on Route 24 during a 6-week shutdown period. MAS, WSP and Fort Miller worked to design a concept consisting primarily of precast substructure components and prefabricated bridge units (PBUs). MAS demolished the existing bridge and installed the new structure ahead of the 6-week milestone. This project has been awarded the CMAA Project Achievement Award in the <$10Mil category.
OWNER: MassDOT
VALUE: $5.8M
LOCATION: Berkley, MA